Burlington County MRF Installation

Time lapse video of the installation of Burlington County’s 35 tons per hour single stream recycling system, engineered and installed by CP Group. The system sorts a variety of recyclables, including recyclable paper, cardboard, glass, steel, aluminum and...

Australia — 30 TPH Material Recovery Facility

CP Group, in conjunction with Australian distributor Wastech, commissioned a state-of-the-art single stream co-mingled material recovery facility (MRF) for Perthwaste in Bibra Lake, Australia. The recycling facility processes 30 tons per hour.  ...

Electronic Waste (eWaste) Recycling Facility

MSS and Krause Manufacturing, both divisions of the CP Group, designed and supplied the equipment for this state-of-the-art eWaste recycling and recovery facility in Georgia.

Construction & Demolition MRF

Construction & Demolition Krause Manufacturing, a division of the CP Group, designs and manufactures the most durable and efficient construction and demolition (C&D) material recovery facilities in the industry....

PVT Land Co. to turn C&D debris into renewable fuel

PVT Land Co. releases a video following the opening of its new 4-acre facility, designed to process construction and demolition (C&D) debris. The facility, engineered, manufactured and installed by San-Diego based CP Group, has been built on PVT’s landfill in...