Case Studies

Out of The Ashes

Out of The Ashes

After a battery fire destroyed its MRF in York, Pennsylvania, Penn Waste pulled off a rebuild in just under a year and is spreading the message of fire prevention and safety. Most recyclers agree that fire prevention and safety are among the biggest issues facing the...

read more
A More Powerful Combination

A More Powerful Combination

Automate your MRF's QC line by pairing AI with air jets for a high-volume sorting solution.  Recently, artificial intelligence (AI) and robotics have been getting a lot of attention. AI sensors combined with robotic arms were introduced to material recovery...

read more
Keys to Building a Successful MRF: Before, During, After

Keys to Building a Successful MRF: Before, During, After

When building a MRF, the goal is to end up with a facility that operates efficiently, requires minimal repairs and downtime, and flexibility to accommodate future equipment upgrades and modifications. Actively seeking out and incorporating practices from experts who focus on design, building, and managing MRFs will elevate the final product of your new, successful facility.

read more
Building A Modern MRF

Building A Modern MRF

The modern MRF has no presort, a reduced headcount, high-volume screening and automated sorting of commodities; Reduced OpEx with increased recovery and purity.   Building a modern MRF involves embracing innovative design principles, leveraging advanced...

read more
Dynamic Pairings

Dynamic Pairings

Sorting success lies in pairing the right sensor technologies with the right method of extraction. At MSS Inc., we know the challenges presented by sorting recyclables at material recovery facilities (MRFs) can be approached in many ways. For 48 years, we have...

read more
A Sustainable Future in Iowa

A Sustainable Future in Iowa

The new Metro Waste Authority (MWA) MRF processes 25 tons per hour of single-stream recycling from more than 100,000 residents in the Des Moines, Iowa metro area. Establishing a State-of-the-Art Recycling Operation To create a successful operation, MWA emphasized...

read more
Forward Thinking Municipal Solid Waste System

Forward Thinking Municipal Solid Waste System

The new facility at Wasatch Integrated processes 40 tons per hour (TPH) of municipal solid waste (MSW) and 15 TPH of single stream on the same line through system design flexibility. Unique Challenge Facility recovers recyclable commodities, organics for use as...

read more
Lessons Learned Operating Las Vegas’ New Massive MRF

Lessons Learned Operating Las Vegas’ New Massive MRF

"Lessons Learned Operating Las Vegas’ New Massive MRF" was published as a feature article on April 15, 2016 on Waste360.com. Read the original article here: http://waste360.com/mrfs/lessons-learned-operating-las-vegas-new-massive-mrf It’s been five months since the...

read more